A joint-project by the government & private corporation; PT Energi Alam Persada. The goal of the project is to study the potential of utilizing the existing Tukad Unda Dam owned by the government and develop it into a hydropower plant. PT NHK provided one-stop service from planning, engineering to execution of the project.
After doing the Topography & Geotechnical Investigation of the dam area, we created the Basic Engineering Design as the blueprint to build the hydropower plant.
Having all the necessary recommendation from the previous steps, we did a thorough Feasibility Study with an encouraging result; Outside of its original function the dam is also highly capable of producing 1,200 Kw of energy. The last step is providing Environmental Impact Assessment to make sure all the possible environmental harm are anticipated.